Form 319-A

E‑GRESS

Robo‑Corp GmbH · Evacuation Procedure
Management on 325 has melted down and the flow is heading your way. The stairs were never built. The elevator bank is jammed with evacuees. The only way out is down, through the floor, one hole at a time.
Section
Egress ↓
319
Storey · Robo‑Corp GmbH
egress on 300
0:00
Hull 100%
Drill 4 holes
Robo‑Corp · Floor Plan Terminal MkII Live
Incident report
Unit offline
Vision ProcessorMkII
Dig a hole, then hold Q beside it to look down.
Personnel
Carrying
WASD move   Space drill the tile ahead
Q look down a hole or vent (hold)
C patch ceiling   R reboot / hotwire (hold)
E doors · hoist chassis
N sound   M music
Walk into a hole and you fall.
Form 319-Z
Shift over
Post‑incident summary
Filed
Form 319-B
Pre‑shift muster
Cost centre · share it to add units
Enter toggles ready · the shift starts when every unit has signed off